The correct answer is option 2, the Hirakud Dam Project. It is the project that supplies electricity to the Rourkela Steel Plant.
The Damodar Valley Project (option 1) is a multipurpose project that was constructed in the Damodar River valley to control floods, generate hydroelectricity, and supply water for irrigation. While it serves the needs of the people in the region, it does not specifically supply electricity to the Rourkela Steel Plant.
The Tungabhadra Project (option 3) is a joint venture between the states of Andhra Pradesh and Karnataka. It was built for irrigation purposes and to generate hydroelectricity. This project does not have any connection to the Rourkela Steel Plant.
The Nagaijuna Project (option 4) is a hydropower project in the state of Andhra Pradesh. However, it does not supply electricity to the Rourkela Steel Plant.
In conclusion, the correct option is 2, the Hirakud Dam Project.